Installation Instructions
INSTALLATION - RECIRCULATING
_-] MOUNT TEMPLATE
• Align the template with the marks on the ceiling and
tape in place.
- Be sure the template is oriented correctlg, with the
front of the hood.
• Usea plumb to be sure the mounting
holes will provide parallel alignment
with the countertop below.
• Center punch all hole locations.
• Drill pilot holes in the 4 screw
locations. Use a 5/32" bit and drill
approximatelg 1-1/2" deep.
• Cut wire access hole approximatelg
1" dia.
r o o_
i
\o Front ofHood o
_-1 INSTALL AIR DEFLECTOR AND
UPPER SUPPORT FRAME
The duct connector is shipped insidethe deflector.
• Snap the plastic connector out of
the deflector and remove. Turn it
over. From the bottom, snap the
connector over the opening.
• Slide the assembled deflector into
the upper support frame and secure
with 4 small screws.
• Securethe upper support frame to
the ceilingjoists and/or cross framing
with the 4 screws provided. Formaximum rigiditg
and strength, the screws must be driven into the center
of the joists and/or cross framing.
• Check to be sure the support frame is level,verticallg
and horizontallg.
Install
4 Screws ] Support
Upper i_ Frame
Support Opening
Frame
- .......... _/Check Levelin
Lower _ _.-_: _Both Direc[ions
Support <- ........ m :::_-:::_*....
Frame .... "'J.........
Hood
Mounting
Flange
Assembled
i Air Deflector
/
/
NOTE:Besureplastic
connectoris installedon
the bottomof the
deflectorasshown.
17
Commentaires sur ces manuels